Sign In | Join Free | My fazendomedia.com |
|
Brand Name : ForPro
Model Number : SCF60
Certification : ISO and CE
Place of Origin : Shanghai
MOQ : 20 piece
Price : $6000-6500/
Payment Terms : L/C, T/T
Supply Ability : 10000 piece/Year
Delivery Time : 30-45 Work days
Packaging Details : Pallet
Material : Q235 Steel,Hot galvanizing, wood,PP Plastic,Timber Beam H20
Color : Green,Blue,Yellow,customized
Application : Concrete Construction,Dam,Pier,bridge,Tall building
Size : Project Drawing,Standard or customized
Feature : Light Weight,One-time Pouring,Fast Assembly & Positioning
Advantage : Easly Removable,Easy Operation Quick climbing and high saftly Coefficient
ForPro SCF60 Automatic Climbing Formwork For Bridge And Super High-rise Building
Outline
ForPro self-climbing formwork is a kind of climbing formwork which can safely move up with its own hydraulic equipment. Self climbing formwork is an idea solution to super high concrete structures like piers,pylon, core of high-rise building, TV tower , ship lift etc. Whole formwork and platform can be moved integrity to next step independent of crane. Fully enclosed platform and handrail housing provide high safely operation environment during the whole working process. Thanks to it’s weather independent advantage, the site construction become faster and even more safer.
Installation procedure
Component
1. ForPro large size timber beam formwork
High quality plywood/Timber beam/steel waler/walerclamp/lifting bracket.
2. Climbing bracket
Horizontal bracket/ vertical profile/ diagonal strut/ vertical Waling/ panel/travelling unit/suspension platform/top platform/ Walerhook bolt.
3. Automatical climber
Guiding rail /lifting device/suspensionshoe/suspension bolt/safety pin/supporting carriage
4. Hydraulic system
Hydraulic cylinder, hydraulic oil line, hydraulic hose connector and hydraulic unit
5. Anchoringsystem
High strength screw/ climbing cone/ position cone/ embedded anchor rod/sealing sleeve.
Technical Specification
• Max. pouring height can reach to 6m;
• Max. lifting capacity reach to 60KN;
• Climbing speed can reach to 0.2m/min;
• Main platform width up to 2.5m, provides sufficient space for formwork retraction up to 750mm and easy for formwork cleaning;
• Min. concrete strength requirement of anchor point is 15KN in working situation;
• 6 levels of working platform provide work space for formwork operation, reinforcement installation, concrete pouring and concrete repair etc.
Applications
Our Services
1. Analysis of the initial stage, and provide professional advice, consultation and formwork planning.
2. Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.
3. Choose a best propasal to help our clients to bid for the project.
4. Start to devise the formwork detailedly according to the winning bidding.
5. Provide the layout and assembly of the formwork, gives on-site advice and continuous support service.
![]() |
Safety Automatic Climbing Formwork For Bridge And Super High Rise Building Images |